Tupolev Tu-16R [1956]

In 1955, the trial enrolled Tu-16R reconnaissance. After their successful completion of this aircraft was built in two series for the day and night reconnaissance. Tu-16R - reconnaissance bomber aircraft and electronic intelligence. There are two main versions of this machine. The first Tu-16R, designed based on the basic model of the Tu-16 had a wide nose cone and was originally used as a carrier …

5 December 2011

Methods of analysis of statistical information - Control Work
Spending Presidents

• July 26 - Day paratrooper »»»
6 July 1930 a group of pilots, paratroopers, led by B.
• Elimination of the "Jubilee" main control began at a time when a large part of preparations for the 1150 anniversary of Smolensk, far from over »»»
Unable to complete work on the Dnieper embankment, construction of sports and recreation complex ecological and biological center "Smolensk Zoo" building preschools for gifted children.
• Moscow hostage fog »»»
2 hours ago 2 hours ago Dense fog enveloped Moscow last night, and continues to this day.
• In Evpatoria completed construction of the largest dolphinarium in Ukraine »»»
In Evpatoria completed construction of a new dolphinarium, which will become the largest not only in the Crimea, but also on the territory of Ukraine.
• Absolute Rally Challenge 3D »»»
Adrenaline overwhelm you with his head from the first seconds of rally competitions!